Background

Applicants who previously applied need not re-apply

The Building Sector Energy Efficiency Project (BSEEP) has for its goal the reduction in the annual growth rate of GHG emissions from the Malaysia buildings sector. The project objective is the improvement of the energy utilization efficiency in Malaysian buildings, particularly those in the commercial and government sectors, by promoting the energy conserving design of new buildings and by improving the energy utilization efficiency in the operation of existing buildings. The realization of this objective will be facilitated through the removal of barriers to the uptake of building energy efficiency technologies, systems, and practices.

This work is part of component 5 of the project. This component will address the lack of demonstration of various key aspects of energy efficiency in buildings. It will provide unparalleled opportunities for both government and private sector practitioners for gaining practical experiences with implementing EE building projects as well as boost confidence in the feasibility, performance, energy, environmental and economic benefits of EE building technology applications, leading to replication of the demonstrations.

Visit www.jkr.gov.my/bseep for further information.

Duties and Responsibilities

Scope of Work

The primary job scope is to develop measurement and verification plans in accordance to the International Performance Measurement and Verification Protocol (IPMVP) for selected projects. The list of building projects will be agreed during the finalization of the workplan/ inception phase. The consultant is also expected to lead a workshop to inform BSEEP and the building owner on the suitable energy efficiency measurement and verification plan required.

Development of six (6) IPMVP compliant measurement and verification plans

Upon identification of projects by the BSEEP team, access the status quo and complete the necessary measurement and verification plan based on the possible energy efficiency retrofits evaluated by other consultants involved in the projects as well as work carried out by the project owner.

Workshop for measurement and verification methodology in implementing the project

From the six (6)  completed measurement and verification plans, lead a workshop with BSEEP and the project owners in fulfilment of the recommended consultative approach/methodology in implementing the project.

Dissemination of measurement and verification training

Develop and deliver a 2 day program on the measurement and verification practices complying to the requirements of IPMVP. This activity will include the design and preparation of the training materials and conduct of seminar/workshops/trainings.

Methodolgy

The consultant will report to the National Project Manager and will work closely with the BSEEP project team based at the Environment and Energy division of the Public Works Department, Kuala Lumpur. The consultant is expected to participate in the initial meeting with the building owners/developers. Meetings with any government agencies will be guided by the BSEEP team as and when necessary. The list of the building projects will be identified during the workplan preparation/inception phase.

Expected Outputs

The consultant is expected to produce:

  • Six (6) IPMVP compliant measurement and verification plans to meet the identified project needs and requirements;
  • Six (6) presentation slides for the workshop detailing the approach and methodology in implementing the identified projects;
  • Completion of the seminars/workshops/trainings on IPMVP measurement and verification including submission of training materials and report on the feedback from participants and its analysis.

Deliverable Timeline

The consultant will be responsible for the delivery, content, technical quality and accuracy of the reports, model(s) and workshop materials. All deliverables shall be submitted to UNDP Malaysia and BSEEP Project Management Unit at Environment and Energy division of the Public Works Department

Documents to be included when submitting the proposal

Interested individuals must submit the following documents/information to demonstrate their qualifications:

  • Proposal on how your qualifications and experience can lead towards the successful deliverable of this assignment within the required timeframe, and provide a brief methodology on how you will approach and conduct the assignment;
  • Financial Proposal as provided. Alternatives are allowed; For Financial proposal template, it is available at http://www.my.undp.org/content/dam/malaysia/docs/Procurement/MyIC_2015_005%20Annex%20I-II.doc
  • Personal CV including areas of expertise and past experience in similar projects and at least three (3) references in the format of UN Personal History Form (P11 form). The UN Personal History Form (P11) is available; at:http://www.my.undp.org/content/dam/malaysia/docs/Procurement/P11%20for%20SC%20&%20IC.doc.

Note

Please scan, save and upload all documents (proposals and P11 Form) into one PDF file.  (The system does not allow more than 1 attachment).
For clarification question, please email to procurement.my@undp.org. The reference number is MyIC_2015_005.

Competencies

Functional Competencies:

  • Knowledgeable in energy efficiency, sustainable energy;
  • Demonstrates strong analytical skills;
  • Consistently approaches work with energy and a positive, constructive attitude.

Development and Operational Effectiveness:

  • Ability to apply peer reviewer guideline production procedures;
  • Ability to analyze technical requirements in energy efficiency and energy management applications;
  • Strong analytical skills.

Management and Leadership:

  • Focuses on impact and result for the client and responds positively to feedback;
  • Supports teams effectively and shows conflict resolution skills;
  • Consistently approaches work with energy and a positive, constructive attitude;
  • Demonstrates strong oral and written communication skills;
  • Builds strong relationships with clients and external actors;
  • Remains calm, in control and good humored even under pressure;
  • Demonstrates openness to change and ability to manage complexities.

Required Skills and Experience

Education:

  • Bachelor’s degree or equivalent in any related field. Master’s degree will have added advantage;
  • Passed the Certified Measurement & Verification Professional (CMVP) Program by Association of Energy Engineer’s.

Experience

  • 5 years of experience with energy efficiency financing or green building design;
  • Knowledgeable in energy policies, regulation and energy management procedures in Malaysia will be added advantage;
  • Experience in drawing up materials and implementing workshops, awareness training and seminars.

Language:

  • Proficient in English;
  • Proficiency in Bahasa Malaysia will be an added advantage.