- Le PNUD dans le monde
Fermer
Le PNUD est présent dans 177 pays et territoires.
Voir ci-dessous pour en savoir plus sur le travail de l'organisation sur le terrain.- Afghanistan
- Afrique du sud
- Albanie
- Algérie
- Angola
- Arabie saoudite
- Argentine
- Arménie
- Azerbaïdjan
- Bahreïn
- Bangladesh
- Barbade
- Bélarus
- Bélize
- Bénin
- Bhoutan
- Bolivie
- Bosnie-Herzégovine
- Botswana
- Brésil
- Bulgarie
- Burkina Faso
- Burundi
- Cambodge
- Cameroun
- Cap-Vert
- Centrafrique (République centrafricaine)
- Chili
- Chine
- Chypre
- Colombie
- Comores
- Congo (République démocratique du)
- Congo (République du)
- Corée (République populaire démocratique de)
- Costa Rica
- Côte d'Ivoire
- Croatie
- Cuba
- Danemark (Bureau de liaison)
- Djibouti
- Egypte
- El Salvador
- Emirats arabes unis
- Equateur
- Erythrée
- Ethiopie
- Fidji
- Finlande (Bureau de liaison)
- Gabon
- Gambie
- Genève (Bureau de liaison)
- Géorgie
- Ghana
- Guatemala
- Guinée
- Guinée-Bissau
- Guinée équatoriale
- Guyane
- Haïti
- Honduras
- Ile Maurice et Seychelles
- Inde
- Indonésie
- Irak
- Iran (République islamique d')
- Jamaïque
- Japon (Bureau de liaison)
- Jordanie
- Kazakhstan
- Kenya
- Kirghizistan
- Kosovo (selon RCSNU 1244)
- Koweït
- Laos
- Lesotho
- Lettonie
- Liban
- Libéria
- Libye
- Lituanie
- L’Ex-République yougoslave de Macédoine
- Madagascar
- Malaisie
- Malawi
- Maldives
- Mali
- Maroc
- Mauritanie
- Mexique
- Moldova
- Mongolie
- Monténégro
- Mozambique
- Myanmar
- Namibie
- Népal
- Nicaragua
- Niger
- Nigéria
- Norvège (Bureau de liaison)
- Ouganda
- Ouzbékistan
- Pakistan
- Panama
- Papouasie-Nouvelle-Guinée
- Paraguay
- Pérou
- Philippines
- Pologne
- Programme palestinien
- République dominicaine
- Roumanie
- Russie (Fédération de)
- Rwanda
- Samoa
- São Tomé-et-Principe
- Sénégal
- Serbie
- Sierra Leone
- Somalie
- Soudan
- Soudan du Sud
- Sri Lanka
- Suède (Bureau de liaison)
- Suriname
- Swaziland
- Syrie (République arabe syrienne)
- Tadjikistan
- Tanzanie (République-Unie de)
- Tchad
- Thaïlande
- Timor-Leste
- Togo
- Trinité et Tobago
- Tunisie
- Turkménistan
- Turquie
- U.E. (Bureau de liaison)
- Ukraine
- Uruguay
- Venezuela (République bolivarienne du)
- Viet Nam
- Washington (Bureau de liaison)
- Yémen
- Zambie
- Zimbabwe
Présence régionale
Le travail du PNUD est administré à travers 5 bureaux régionaux - A propos du PNUD
- Publications
- Centre de presse
Final Evaluation of BIOSFAC Moz Project | |
Lieu : | Maputo, MOZAMBIQUE |
Date limite de candidature : | 11-Oct-22 (Minuit New York, États-Unis) |
Catégorie supplémentaire : | Climat et adaptation |
Type de contrat : | Individual Contract |
Niveau du poste : | National Consultant |
Langues requises : | Anglais Portugais |
Date de commencement : (date à laquelle le candidat sélectionné doit commencer) | 13-Sep-2022 |
Durée du contrat initial | 30 Working days |
Durée prévue de la mission : | 30 Working days |
Le PNUD s’engage à recruter un personnel divers en termes de genre, de nationalité et de culture. Nous encourageons de même les personnes issues des minorités ethniques, des communautés autochtones ou handicapées à postuler. Toutes les candidatures seront traitées dans la plus stricte confidentialité. Le PNUD ne tolère pas l’exploitation et / ou les atteintes sexuelles, ni aucune forme de harcèlement, y compris le harcèlement sexuel, et / ou toutes formes de discrimination. Tous/tes les candidats/tes selectectionnes /ées devront ainsi se soumettre à de rigoureuses vérifications relatives aux références fournies ainsi qu’à leurs antécédents. |
Historique |
|
The United Nations Development Programme (UNDP) in partnership with the National Administration of Conservation Areas (ANAC) and the Mozambique Fund for Biodiversity Conservation (BIOFUND), has been implementing the project designated “Diversification of Ecosystem Goods and Services for Finance Sustainability and Wildlife Management of Protected Areas in Mozambique” – BIOSFAC Moz. The overall objective of the project is to improve the financial sustainability of protected areas by increasing revenues. Under this project framework, this would be achieved through exploration of approaches that would lead to unlocking of additional stream of revenues from monetarization of ecosystem services and goods, while improving the systems for an effective management of other type of revenues currently in place. Consequently, the project was designed to be operationalized in three inter-related components, namely: Component 1 – Knowledge and know-how on how to monetarise a diverse set of ecosystem goods and services focusing on better understanding of options that exist to increase such revenues, either through unlocking existing ecosystem goods and services, or setting up relevant systems to make these more accessible. Relevant background research was planned to be undertaken in three pilot Protected Areas (Pas), Magoe National Park, Pomene National Reserve and Quirimbas National Park. The work would be undertaken to further substantiate already existing Management Plans and directed to leverage investment and Public Private Partnerships (PPP) opportunities. Component 2 – Planning, policy and legal frameworks supporting financial sustainability of PAs will ensure that the relevant enabling planning, policy and legal framework is in place that will allow unlocking benefits from PAs. For instance, the new Conservation Law Regulations require operationalization. A focus would be on a revision of entry and user fees and a systematization of their collection. Linked to the background studies prepared under component 1, PA specific actions from the financial and/or business plans would be supported. Component 3 – Systems and capacity of ANAC and BIOFUND for financial sustainability focuses on strengthening the institutional and operational set-up at these two key institutions. Following a functional and structural review of ANAC, relevant institutional alignments would be supported including capacity building through on-job training initiatives. The resource base of Biofund will be furthered especially through establishing a national biodiversity offset scheme. This project was designed following a UNDP/Global Environment Fund (GEF) supported project intervention, namely the “Sustainable Financing of the Protected Areas System in Mozambique” or PROFIN (PIMS 3938), whose terminal evaluation identified several Lessons Learnt from the project interventions, but also made very explicit recommendations for further addressing remaining barriers to advance financial (and management) sustainability of the PA system. As a result, The Government of Mozambique (GoM) requested UNDP to continue and deepen the started work between 2017- 2020, which coincides with the new United Nations Development Assistance Framework (UNDAF) and the UNDP Country Programmatic cycle, but the new project only started implementation in mid-2019. From its original conception until its implementation, however,this project experienced some changes and adjustments of outputs and activities, based on discussions and agreements among the parties on what were considered priority needs and feasible approaches of interventions considering the prevailing conditions.
|
|
Devoirs et responsabilités |
|
|
|
Compétences |
|
Corporate competencies:
Functional competencies:
| |
Qualifications et expériences requises |
|
Academic qualifications:
Experience:
Languages:
HOW TO APPLY AND PROCEDURES TO FOLLOW UP The documentation for this application, listed in Section 11 should be submitted through this platform uploading the the mentioned documents below until 20 September 2022. Proposals received after the deadline will not be considered. Any request for clarification must be sent by standard electronic communication to procurement.mozambique@undp.org. The UNDP CO Procurement Unit will respond in writing or by standard electronic mail and will send written copies of the response, including an explanation of the query without identifying the source of inquiry, to all candidates. The financial proposal should be comprehensive and include a breakdown. Other components to be presented in the application process include:
|
|
Si vous éprouvez des difficultés avec les candidatures en ligne, merci de contacter le eRecruit Helpdesk