Background

The existing drainage system in the UN Compound is found to be non-efficient in draining out water and wastes from the compound, especially when there is heavy rainfall. Due to La Nina effect, the rainfall this year and in the coming year are expected to be more than usual and thus causing flood. The poor drainage system causes water stagnancy inside the compound and thus causing damages to the building and to other assets and properties. The recent flash flood caused by heavy rainfall in April 2021 is a stark example of such damages. Therefore, improvement of the drainage system needs immediate attention and needful rework.

Devoirs et responsabilités

General Objective of assignment

UNDP Timor-Leste seeks to establish a contract with competent and technically qualified consultancy firm to conduct a detailed technical assessment and prepare the Drainage Master Plan for UN Compound which include recommendations and detailed technical design proposals with costing to address the drainage problems and reduce the impacts of flooding in the UN Compound.

 

SCOPE OF WORK

To formulate the long-term solution for the Drainage management problems at the UN Timor-Leste compound in Caicoli Street to reduce the adverse effects of heavy rainfall and the accumulation of rainwater which cause flooding in the UN compound. The Drainage Master Plan Consultancy team will work under the supervision of the Common Premise Manager and Operations Management Team (OMT) and perform the following tasks:

Deliverable/Task 1:

  • Conduct a site reconnaissance of the entire compound and environs, stakeholder meetings and consultation to identify existing issues, frequency or occurrence and the magnitude of the problems associated with recurring floods
  • Gather and review all available data to facilitate proper engineering analysis and design such as flood hazard mapping, surveys and determine the extent of physical assets and buildings that are affected
  • Where necessary undertake topographic surveys of the compound and surroundings to conduct the hydrological analyses and hydraulic assessments
  • Find and analyze any associated risks and challenges that may face on the implementation
  • Prepare and present the preliminary findings to UNCT for feedback and inputs

Deliverable/Task 2

  • Based on the findings and considering the feedback from the meeting with stakeholders, prepare and present the draft Drainage Master Plan including preliminary/conceptual designs and options for review and feedback
  • Where possible adopt sustainable engineering designs and solutions utilizing methods such as bioengineering solutions, infiltration trenches, gabion structures, reinforced concrete structures and geotextiles in the preliminary designs

Deliverable/Task 3

  • Submit the final Drainage Master Plan for UN Compound with the key findings and recommendations incorporating the feedback and inputs received from stakeholders’ and consultations/meetings
  • Prepare and submit all the associated technical documents and reports which include the detailed design drawings, BOQs/engineer’s estimates, technical specifications and implementation plan for the proposed drainage Master Plan and the procurement strategy for the proposed works.
    • Review project site of UN Compound (Area of UN Compound – 3.369 hectares or 33,690 square meters).
    • Assess the feasibility for the integrated system particularly the Environmental sanitation tools.
    • Conduct 1 briefing session with the OMT on the findings and recommendations.

 

  1. Expected Outputs and Deliverables
  •  

Expected Key Performance Indicators (KPIs) and deliverables

Number of Days

Due date

Review & Approval

  1.  

Deliverable 1:

Site assessment and presentation of preliminary findings

  • Conduct a site reconnaissance of the entire compound and environs, stakeholder meetings and consultation to identify existing issues, frequency or occurrence and the magnitude of the problems associated with recurring floods
  • Gather and review all available data to facilitate proper engineering analysis and design such as flood hazard mapping, surveys and determine the extent of physical assets and buildings that are affected
  • Where necessary undertake topographic surveys of the compound and surroundings to conduct the hydrological analyses and hydraulic assessments
  • Prepare and present the preliminary findings to UNCT for feedback and inputs
  • Find and analyze any associated risks and challenges that may face on the implementation

 

10 days

15 January 2023

OMT and UNCT

  1.  

Deliverable 2:

Preparation and presentation of the draft Drainage Master Plan including the preliminary/conceptual designs and options

  • Based on the findings and considering the feedback from the meeting with stakeholders, prepare and present the draft Drainage Master Plan including preliminary/conceptual designs and options for review and feedback

 

  • Where possible adopt sustainable engineering designs and solutions utilizing methods such as bioengineering solutions, infiltration trenches, gabion structures, reinforced concrete structures and geotextiles in the preliminary designs

 

 

15 days

05 February 2023

OMT team

  1.  

Deliverable 3:

Submission of Final Drainage Master Plan for UN Compound and associated technical reports and presentation.

  • Prepare and submit the final Drainage Master Plan with the key findings and recommendations incorporating the feedback and inputs received from stakeholders’ and consultations/meetings
  • Prepare and submit all the associated technical documents and reports which include the detailed design drawings, BOQs/engineer’s estimates, technical specifications and implementation plan for the proposed drainage Master Plan and the procurement strategy for the proposed works.

 

10 days

28 February 2022

OMT teams and Public Works

 

 

INSTITUTIONAL ARRANGEMENTS

The consultant will report to the UNDP Common Premises Unit and OMT. A committee will be established within UNDP consisting of one National Civil Engineer and representatives of other UN agencies. The deliverables will be reviewed and accepted by this committee.

 

DURATION OF ASSIGNMENT

The assignment will be for maximum 35 working days over the period of 2 months between January 2023 to February 2023.

 

Duty Station

Dili, Timor-Leste.

 

The consultant must be available for meetings with the UNCT, OMT team and Public Works team for the preparation of technical information. Arrangement for such meetings and visits will be coordinated by the consultant with the project team based on project work plan/schedule.

Compétences

Other Competencies:

  • Excellent interpersonal and networking skills, including the ability to liaise effectively at project management levels.
  • Ability to communicate and function effectively in an international, multicultural environment.
  • Ability to work effectively in a team.

Qualifications et expériences requises

Education:

  • University degree a bachelor or higher-level degree in civil engineering, environmental engineering, or public health engineering.

Professional Experience:

  • A minimum of 5 years' experience in: A. Planning, designing and construction of centralized and decentralized systems, sewerage, Environmental sanitation tools, pumping systems, sludge and effluent management, etc.
  • Experience in similar projects working as Drainage Engineer.
  • Experience in the donor funded projects of Water will be an added advantage. 6. Knowledge of climate change impacts and resilience strategies.

Language Requirements:

  • Fluently in spoken and written English and Tetum.

SCOPE OF PRICE PROPOSAL AND SCHEDULE OF PAYMENTS

Lump Sum Amount

The financial proposal must be expressed in the form of a lump sum all-inclusive cost linked to deliverables specified in ToR Section, supported by a breakdown of costs as per the template provided. 

 

Schedule of payments

Per deliverable/s upon submission of its completion deliverables report and accepted by UNDP, each deliverable as per the timeline mentioned in section C (expected outputs and deliverables).

Deliverable/Outputs

Target due dates

Breakdown of the payment

Deliverable 1:

Site assessment and presentation of preliminary findings

  • Conduct a site reconnaissance of the entire compound and environs, stakeholder meetings and consultation to identify existing issues, frequency or occurrence and the magnitude of the problems associated with recurring floods
  • Gather and review all available data to facilitate proper engineering analysis and design such as flood hazard mapping, surveys and determine the extent of physical assets and buildings that are affected
  • Where necessary undertake topographic surveys of the compound and surroundings to conduct the hydrological analyses and hydraulic assessments
  • Prepare and present the preliminary findings to UNCT for feedback and inputs
  • Find and analyze any associated risks and challenges that may face on the implementation

 

10 days

30%

Deliverable 2:

Preparation and presentation of the draft Drainage Master Plan including the preliminary/conceptual designs and options

  • Based on the findings and considering the feedback from the meeting with stakeholders, prepare and present the draft Drainage Master Plan including preliminary/conceptual designs and options for review and feedback
  • Where possible adopt sustainable engineering designs and solutions utilizing methods such as bioengineering solutions, infiltration trenches, gabion structures, reinforced concrete structures and geotextiles in the preliminary designs

 

15 days

40%

Deliverable 3:

Submission of Final Drainage Master Plan for UN Compound and associated technical reports and presentation.

  • Prepare and submit the final Drainage Master Plan with the key findings and recommendations incorporating the feedback and inputs received from stakeholders’ and consultations/meetings
  • Prepare and submit all the associated technical documents and reports which include the design drawings, BOQs/engineer’s estimates, technical specifications and implementation plan for the proposed drainage Master Plan and the procurement strategy for the proposed works.

 

10 days

30%

Total

35 days

100%

 

 

Recommended Presentation of Offer

 

Individual consultants interested in the assignment must submit the following documents to demonstrate their qualification in one single PDF document:

 

  1. Duly accomplished Letter of Confirmation of Interest and Availability using the template provided by UNDP (the template to be downloaded from the procurement notice link).
  2. Personal CV or P11 indicating all past experiences from similar projects, as well as the contact details (email and telephone number) of the Candidate and at least three (2) professional references (to be downloaded from the procurement notice link).
  3. Financial Proposal: that indicates the all-inclusive fixed total contract price, supported by a breakdown of costs, as per template provided (the template to be downloaded from the procurement notice link).
  4. Technical Proposal:
    1. Brief description of why the individual considers him/herself as the most suitable for the assignment;
    2. A methodology, on how they will approach and complete the assignment and work plan as indicated above.

 

 

Evaluation Method and Criteria:

Individual consultant will be evaluated based on the following methodology:

The award of the contract shall be made to the individual consultant whose offer has been evaluated and determined as:

  1. Responsive/compliant/acceptable, and
  2. Having received the highest score out of a pre-determined set of weighted technical and financial criteria specific to the solicitation.

* Technical Criteria weight 70%

* Financial Criteria weight 30%

 

Only candidates obtaining a minimum of 49 points (70% of the total technical points) would be considered for the Financial Evaluation.

 

Technical Evaluation (70%)

Qualification, Experience and Technical Proposal (70 marks):

  1. General Qualification 30 marks);
  2. Experience relevant to the assignment (30 marks);
  3. Technical Proposal: Brief methodology and workplan on how the consultant will approach and complete the work (20 marks).

 

Financial Evaluation (30%):

The following formula will be used to evaluate financial proposal:

p = y (µ/z), where

p = points for the financial proposal being evaluated

y = maximum number of points for the financial proposal

µ = price of the lowest priced proposal

z = price of the proposal being evaluated

 